We were awarded a contract through the Green Community Initiative to design and replace the aging HVAC infrastructure. This work included boiler plant upgrades, chiller pumps and repiping, water heating upgrades, and the complete overhaul of the police station heating and cooling system. The existing system was upgraded with a high efficacy VRF heat recovery system and a separate building ventilation system.